Showing posts with label Fort Totten. Show all posts
Showing posts with label Fort Totten. Show all posts

Thursday, July 19, 2012


The Rudolph School building in Brightwood / Fort Totten
One of four empty school buildings in DC that the District's Department of General Services put up for public charter school bidding in April has been awarded to Washington Latin Charter School.  This week, DGS and the Deputy Mayor for Education recommended that the city award the Rudolph School, located at 5200 2nd Street, NW, in the Brightwood / Fort Totten neighborhood of Northwest DC, to Washington Latin.

Washington Latin, which is going into its sixth year, features a classical curriculum and Latin language education starting in the 5th grade. The school also has a full athletic program, and also teaches the modern languages Arabic, French, and Chinese.  Washington Latin currently occupies three buildings on 16th Street, but plans to spend $15 million to occupy the 84,000 square foot former Rudolph School facility in Brightwood by August, 2013.  Mark Lerner, president of the Washington Latin board of governors, said Washington Latin would finance the restoration with a commercial loan, and then repay it with the facility allotment that charter schools receive from the District.

Future home of Washington Latin, which has an athletic program
While the Rudolph School closed in 2008 because of low occupancy, DC's public charter schools often face a different problem: space limitations and growing student bodies.  "Every charter school gradually adds grades per year, and many charter schools close because they can't grow because they can't solve this facility problem," said Lerner.

Lerner said Washington Latin started in 2006 with 179 but that the school now served 600 students from all eight wards of the District in grades 5-12.  The school offers bus pickups for students in Ward 3, where the school first began in 2006, and at Union Station.

The Rudolph School closed in 2008 due to low enrollment
Most charter schools, Lerner said, open in temporary locations because they don't have full enrollment when they open.  "Parents and staff become eventually dissatisfied if you don't have appropriate facilities," he told DCMud.  "Our being awarded Rudolph is a major milestone for the school," Lerner said.  "It gives us a permanent space."

Deputy Mayor for Education De'Shawn Wright wrote in a press release, "Ultimately, the panel recommended Washington Latin based on a strong performance record and an exciting proposal for reusing the building."

Washington D.C. real estate development news

Wednesday, March 21, 2012

One of Ft. Totten's most transformative developments is at last on the way, and with it, a new neighborhood. The Art Place at Fort Totten, the 826 unit mixed-use complex that sits between the Metro station and South Dakota Avenue, is ready to begin construction "within the next few weeks." The project, conceived by the Morris and Gwendolyn Cafritz Foundation, will form a new community with over 300,000 s.f. of retail, 2282 parking spaces, a children's museum, and senior's home in 4 separate buildings.

The plan has been on the boards for years - developers hoped to break ground in 2010 even after the market crash - as part of plans by the city to spur all local owners to coordinate development of the area, one of the last Metro centers that has not seen significant development. The first phase is expected to complete 30-36 months from now.

With construction fences now up, and raze permits all but finalized, developer Jane Cafritz says demolition will commence "in the next 3 to 4 weeks" on "Building A" at South Dakota and Galloway. The multi-phase project will start with the demolition of 5 of the 15 buildings on the 16 acre site in order to make way for 1 of the 4 planned mixed-use buildings. This phase will incorporate about 530 residential units and 110,000 s.f. of retail, though no grocery store at this point due to the Walmart planned across the street, which may be underway as early as this summer.
Cafritz says timing on the project was not affected by the announcement of Walmart. "We're there to be a catalyst in the neighborhood."

Phase 1 will also incorporate a small subsidized housing component and the senior living center; and about half of the 98 units of senior housing will go to current residents of Riggs Plaza. Cafritz notes that the project was designed in phases partly to accommodate existing tenants "that we have great repsect for that have been on site literally for generations." Ultimately all the buildings will be connected by an underground parking garage. All buildings have been approved by DC zoning officials but timing and design issues for Buildings B, C and D have not yet been finalized. While no office space has been planned, Cafritz notes that the first phase will incorporate flex-space that could be either retail or office. The Children's Museum is planned for the second phase of construction.

The Cafritz Foundation had earlier dangled the prospect of hosting both the Washington National Opera and the Shakespeare Theatre for storage, rehearsal space and related shops, a scenario that has now been shelved, but Jane Cafritz says her team is now talking to other similar non-profits. All residential units will be for-rent, the "Foundation owns this and intends to keep this," says Cafritz.

Master planning for the site was done by Ehrenkrantz Eckstut and Kuhn (EE&K), Shalom Baranes Architects (SBA) has designed the first of the four buildings, and MV+A Architects is designing the retail, all to meet basic LEED certification standards.

The eight-story Building C is planned as entirely residential, built in two C-shaped wings, joined at the second level, to accommodate the possibility of a new 3rd Street connecting the Arts Place property to the neighboring Food and Friends property, should the neighbors decide to sell or redevelop at a later date.

Washington D.C. real estate development news